Second Niger Bridge Completed, Set For Commissioning...Fashola


The Minister of Works and Housing, Babatunde Fashola, on Wednesday, confirmed that the construction of the 2nd Niger bridge is now completed and will soon be released to the public for use.


He stated this at an ongoing press briefing to present the President Muhammadu Buhari’s scorecard in Abuja.


According to him, the only factor delaying the commissioning of the road is the construction of the link road which the recent surge of flooding has impeded.


He said, “I can confirm that the second Niger bridge itself is finished. People can walk through the bridge now unimpeded. What remains is the four-kilometer link road on the Asaba side.


“Right now, our dredger is in place, we have to rebuild the road by reclaiming sand, the recent surge of flood has slowed us down. On the Onitsha side, there is a 7kilometer road that links the bridge and the Onitsha-Owerri interchange.”


CKN NEWS

Chris Kehinde Nwandu is the Editor In Chief of CKNNEWS || He is a Law graduate and an Alumnus of Lagos State University, Lead City University Ibadan and Nigerian Institute Of Journalism || With over 2 decades practice in Journalism, PR and Advertising, he is a member of several Professional bodies within and outside Nigeria || Member: Institute Of Chartered Arbitrators ( UK ) || Member : Institute of Chartered Mediators And Conciliation || Member : Nigerian Institute Of Public Relations || Member : Advertising Practitioners Council of Nigeria || Fellow : Institute of Personality Development And Customer Relationship Management || Member and Chairman Board Of Trustees: Guild Of Professional Bloggers of Nigeria

Previous Post Next Post

نموذج الاتصال